Drilling and Mucking Bench [of] Lower Half of Tunnel [Catskill System.]
Assembling Steel Shell of Steel Pipe Siphon [Catskill System.]
Typical Pressure Tunnel Construction Shaft [Catskill System.]
Exploratory Drilling in Esopus Creek at Site of Olive Bridge Dam [Catskill System.]
Rondout Pressure Tunnel Showing Partial and Total Concrete Lining [Catskill System.]
Kensico Aerator and Screen Chamber [Catskill System.]
Bucket Used to Lower Men and Materials During Sinking of Tunnel Shafts [Catskill System.]
Kensico Dam, Looking North-West [Catskill System.]
Interior of Typical City Tunnel Shaft Chamber [Catskill System.]
Typical Stages of Cut-and-Cover Construction [Catskill System.]
Bryn Mawr Connection Chamber at Commencement of Yonkers Pressure Tunnel [Catskill System.]
Ashokan Aerator and Screen Chamber [Catskill System.]
Yonkers Pressure Tunnel, 16-Feet, 7 Inches in Diameter [Catskill System.]
Olive Bridge Dam, Downstream Face [Catskill System.]
Traver Hollow Bridge, Ashokan Reservoir [Catskill System.]
Finished Cut-and-Cover Aqueduct [Catskill System.]
By-Pass Aqueduct Around Kensico Reservoir 11 Feet in Diameter [Catskill System.]
Kensico Dam From South-West [Catskill System.]
Breakneck Gaging Chamber [Catskill System.]